  • LOCATION: Torrejón (Madrid, Spain)
  • ACTIVITY DESCRIPTION: Logistics Operator. European leader in temperature‑controlled logistics, specialised in frozen products (-25°C), both picking and transport.
The assembly was performed in two stages to accelerate the completion of the project. We installed the main structure (columns and beams) on the footings, without floor screed, reducing the final delivery of the mezzanine floor by 3 weeks.

MEZZANINE FLOORS CHARACTERISTICS

  • AREA: 1,800 m²
  • UTILISATION: Heavy warehousing
  • LOAD CAPACITY: 1,000 kg/m²
  • FLOOR: High density chipboard 38 mm thick. Anti-slip finish Stone / White melamine
  • LEVELS: 1 extendable level
  • CONTRUCTION PERIOD: 3 months

KEY FACTS

  • Mezzanine floor with 8 m spans between columns
  • Use of electric stackers to lift pallets onto pallet racks
  • Permissible point load 1,500 kg