Two-tier mezzanine of 1233 m² for medium load storage (500 kg / m²)
In its plant sited in Getafe (Spain), where takes place Eurofighter wing manufacturing, Construcciones Aeronaúticas features a two-tier mezzanine of 1233 m² for medium load storage (500 kg / m²). It is located on the warehouse of replacement pieces and components. Its implementation has been a challenge because it had to be mounted on an existing installation of carousels. To do this, we used the crane bridge which is available on the building.